Ross-on-Wye Flood Alleviation Scheme

Construction of 400LM of 2.1m TBM driven segmentally lined tunnel, plus access shafts sunk as caissons

Rorcon Limited provided Morgan Sindall all the specialist personnel to man their Lovat TBM which build a new section of flood relief sewer in the town of Ross of Wye. The tunnel excavated through some extremely difficult ground conditions.