“Essen Sammler Barchembach” – SMET Essen, Germany

Supply of specialist labour for the construction of 1.8m ID pipejack over 1150m using a Herrenknecht AVND2000 TBM machine.

Essen, Germany – 2019

Rorcon are supplying specialist labour to SMET for a 1km pipejack in Essen, Germany. The pipejack is 1.8m ID, 2.4m OD and will be completed in one length using inter-jacks. The project is using a Herrenknecht AVND2000 TBM machine coupled with a bentonite slurry plant system.